Wilkes-Barre Wishlist

Professional Nerdy Girl
Follow Me

Wilkes-Barre Wishlist

By M Davies   /     Nov 11, 2007  /     NEPA  /  

I usually have a master list of roads I would like to have paved for Wilkes-Barre, but over the last year a lot of them have been completed…so I’m going to change it up a bit.  I’m expanding my list to projects to be finished, stuff to be cleaned up, roads to be paved, potholes to be filled.  If you think of anything I’m missing, please let me know and I’ll add it.

-Finish fixing South Main Street (near Bart & Urby’s & Marquis Art & Frame)

-Finish paving Wilkes-Barre Blvd near Hazle Street (Come on, its been like 2 weeks!!)

-Finish paving Ross Street (Again, Its been 2 weeks, what’s the hold up????)

-Knock down the building on the Corner of West Ross & South River Street (This should have been done years ago – I know, I’m Monday morning quarterbacking it)

-Knock down the Murray Complex — BOTH of them.

-Fix the huge potholes going down the hill on South Main Street, by Abe Solomon’s

-Please for the love of god, pave Division Street (at least the Wilkes-Barre side of it)

That’s it for now, but I think that’s a good start.  I’ll keep adding to it, as the list of annoyances grows.

About M Davies

Hi! My name is Michelle and I'm the sassy author of this blog. I also am a wife, mother, sister, daughter, contributor at NEPA Blogs, 1/3 of NEPA BlogCon and work behind-the-scenes in local TV.

Post a Comment

Your email address will not be published. Required fields are marked *

*